Frozen weekly position
Capture a formal weekly snapshot rather than letting historic reports drift with live data.
Construction progress reporting
Hirentra turns measured Site Progress into a controlled weekly reporting chain. Weekly snapshots freeze the position, Progress Plans and photo evidence support the visual record, and issued reports remain immutable with revision history and distribution audit.
Capture a formal weekly snapshot rather than letting historic reports drift with live data.
Include active Progress Plans across working areas with markup locked to the drawing coordinates.
Archive exact PDFs, retain revisions and record controlled report distribution.
01 / WHAT IT CONTROLS
Hirentra is built for live construction environments where operational evidence, cost exposure and progress information need to stay current and accountable.
Freeze the site position for the reporting week.
Build the report from work packages, progress evidence and site-level context.
Include the latest active drawing for each relevant working area rather than only the plan currently open in the browser.
Archive immutable revisions and retain transmittal history when reports are distributed.
02 / WORKFLOW
Maintain work-package progress and evidence during the week.
Capture the weekly snapshot at the reporting cut-off.
Produce the site report from the frozen position and current report evidence.
Archive the exact PDF, distribute it and retain the audit trail.
03 / BUILT FOR THE TEAM
Reduce the need to rebuild weekly progress information manually.
Receive a clearer measured and evidenced site position for commercial review.
Review site and portfolio reporting from controlled weekly positions rather than live numbers that change after the fact.
SITE PROGRESS / HIRENTRA
Hirentra Site Progress links measured work-package quantities with working areas, visual Progress Plans, markups, photo evidence, weekly reporting and forecast completion. QS/Commercial teams and Managers can spend less time rebuilding progress information manually and more time dealing with delivery and commercial exceptions.
Explore Site Progress04 / QUESTIONS
Yes. Site-level weekly reporting can include the latest active Progress Plan for each relevant working area/drawing group.
Issued reports are treated as immutable. Corrections should be issued as a new revision rather than changing the archived PDF.
Yes. Plan photo evidence can be included as thumbnails or a fuller appendix depending on reporting needs.
Yes. Controlled distribution can retain recipient, sender, timestamp, provider reference and document fingerprint information.
Construction operations software
See how Hirentra brings hire, commercial and site progress information into one controlled workflow.
Visit Hirentra