Off-hire management

Make off-hire a controlled event—not an email you hope was actioned.

Missed or poorly evidenced off-hires can turn into avoidable hire days and difficult supplier conversations. Hirentra keeps the request, timing, collection evidence and resulting exposure connected to the item and project.

01

Request evidence

Retain when the off-hire was raised rather than relying on inbox history.

02

Collection control

Keep collection status and supporting evidence visible.

03

Avoidable exposure

Surface overdue off-hires separately from legitimate live hire commitment.

01 / WHAT IT CONTROLS

Off-hire request

Hirentra is built for live construction environments where operational evidence, cost exposure and progress information need to stay current and accountable.

Off-hire request

Record the request against the live hire item.

Collection status

See which items are still waiting for collection.

Evidence

Attach site evidence so disputed hire periods can be reviewed with context.

Commercial exception

Escalate overdue or avoidable exposure into an accountable action when needed.

02 / WORKFLOW

From site activity to a decision-ready record.

  1. 01

    Request

    Record the off-hire against the correct hire item.

  2. 02

    Wait visibly

    Keep the item visible while supplier collection remains outstanding.

  3. 03

    Evidence collection

    Record collection/return evidence when the item leaves.

  4. 04

    Reconcile

    Use the timestamps and evidence to support supplier charge review.

03 / BUILT FOR THE TEAM

Useful at site level. Clear at commercial and director level.

Site Managers

See which equipment should no longer be on site and what is still awaiting collection.

QS / Commercial

Identify avoidable cost and support disputes with a clearer operational record.

Directors

See overdue off-hire exposure as an exception, not confuse it with total legitimate hire spend.

SITE PROGRESS / HIRENTRA

Progress evidence should reduce reporting time—not create more admin.

Hirentra Site Progress links measured work-package quantities with working areas, visual Progress Plans, markups, photo evidence, weekly reporting and forecast completion. QS/Commercial teams and Managers can spend less time rebuilding progress information manually and more time dealing with delivery and commercial exceptions.

Explore Site Progress

04 / QUESTIONS

Common questions.

Why does off-hire evidence matter?

The date a request was sent and the date an item was actually collected can affect the hire period and any later supplier dispute.

Can Hirentra highlight overdue off-hires?

Yes. Overdue off-hire items can be surfaced separately and contribute to avoidable exposure.

Can a Director assign an off-hire issue?

Commercial exceptions can be turned into owned actions using the existing intervention and action-register workflow.

Does it support photos?

Yes. Evidence can be retained alongside the operational record.

Construction operations software

Less chasing.
More control.

See how Hirentra brings hire, commercial and site progress information into one controlled workflow.

Visit Hirentra